Granite City steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key issues
- Participation
- Steel plant overview
- Iron Ore
- Coal
- Coke
- Metallics
- Energy
- Capital costs
- Operating cash costs
Tables and charts
This report includes the following images and tables:
-
Detailed mapDownstream productsFinished steel production
-
Production table (Mt)Capital costsTotal operating cash costs - Finished steelOperating cash cost tableEconomic assumptionsKey raw materials rates
What's included
This report contains:
Other reports you may be interested in
Port Talbot (BOF) steel plant
Tata Steel will halt its blast furnace operations by September 2024 as part of its strategic shift towards low-carbon EAF steel production.
$2,250Scunthorpe (BOF) steel plant
British Steel has announced it will close down its blast furnaces in Scunthorpe by 2026, in a move to switch to EAF-based steelmaking.
$2,250Huale Alloy BF nickel operation
Detailed cost analysis of the Huale Alloy blast furnace NPI facility.
$2,250