Asset Report

Granites (Tanami Operations) gold mine

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

29 September 2022

Granites (Tanami Operations) gold mine

Report summary

Granites (Tanami Operations) consists of the Granites treatment plant and mining operations, located in the Northern Territory approximately 550 kilometres northwest of Alice Springs and the Dead Bullock Soak mining operations, approximately 40 kilometres west of the Granites. Ore from the Callie underground mine at Dead Bullock Soak is processed through the Granites treatment plant. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • Power
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Granites (Tanami Operations) gold mine

    XLS 145.00 KB

  • Document

    Granites (Tanami Operations) gold mine

    PDF 917.98 KB

  • Document

    Granites (Tanami Operations) gold mine

    ZIP 937.42 KB