Guelb el Rhein iron ore mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
Tables and charts
This report includes the following images and tables:
-
Detail mapParticipationMarketable reserves (at 01/01/2025)
-
OperationsProductionProductionInfrastructureCash costsCash costsCapital costsProduct qualityEconomic assumptions
What's included
This report contains:
Other reports you may be interested in
El Aouj iron ore mine
A feasibility study for Stage 1 of the 11 Mtpa El Aouj deposit was completed at the end of 2015; the mine will start operating in Q1 2027.
$2,250Itabira (Southeastern System) iron ore mine
Vale's Itabira complex in Minas Gerais is a key producer of DR grade pellet feed. Operations are shifting to the Conceição plant.
$2,250Vargem Grande (Southern System) iron ore mine
A complex comprising five mines and two processing facilities. The output is a mix of fines and concentrates to domestic and export markets.
$2,250