Asset Report
Guojiagou zinc mine
Report summary
Guojiagou is a zinc and lead mine located in Hui County, Gansu Province. The operation consists of an underground mine and a beneficiation plant. The designed throughput capacity is 5000 tpd, with 300 working days in a year. The mine was commissioned in 2016. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Milling
- Capex
- Power
- Water
- Transportation
Tables and charts
This report includes 1 images and tables including:
- Detailed Map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Hellyer Mine Restart (Closed) zinc mine
A detailed analysis of the Hellyer Mine Restart zinc mine.
$2,250
Asset Report
Colquijirca (El Brocal) zinc mine
A detailed cost competitive analysis of the Colquijirca (El Brocal) zinc mine.
$2,250
Asset Report
Raura zinc mine
A detailed production and cost competitive analysis of the Raura zinc mine.
$2,250