Asset Report
Hellyer Mine Restart (Closed) zinc mine
Report summary
This profile relates to Bass Metals' Hellyer Mine Project (HMP), a restart of the Hellyer Zn-Pb mine that closed in 2000. The HMP sources ore from the Fossey deposit for processing at the Hellyer mill. The planned mill rate of 400kt/a was reduced to 350kt/a in an updated mine plan in 2011, subsequent to the discovery of widespread low grade barite altered ore across the Fossey deposit. The mine and mill was placed on care-and-maintenance in mid-2012.
Table of contents
-
CAPEX
- HMP Resources (as at 30 June 2013)
- HMP Reserves (as at 30 June 2012 - prior to closure)
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Hellyer Tailings (Closed) zinc mine
A detailed analysis of the Hellyer Tailings zinc mine.
$2,250
Asset Report
Wolverine (Closed) zinc mine
A detailed analysis of the Wolverine zinc mine.
$2,250
Asset Report
Mae Sod (closed) zinc mine
A detailed analysis along the production and commercialisation chain of the Mae Sod zinc mine.
$2,250