Asset report

Hellyer Tailings (Closed) zinc mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The re processing of Hellyer mine Tailings was carried out between 2006 and 2008. Bass Metals is undertaking a pre feasibility into the re start of re processing of old Hellyer mine tailings which may be undertaken in the future. Bass Metals is currently reviewing the options for this process route. The mine and mill was placed on care and maintenance in mid 2012 and the future of this operation is uncertain. The gold rich portion of tailings could potentially be sold as a separate project.

What's included

This report contains

  • Document

    Hellyer Tailings zinc mine

    XLS 483.00 KB

  • Document

    Hellyer Tailings (Closed) zinc mine

    PDF 440.07 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898