Asset Report

Horne copper smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

09 June 2017

Horne copper smelter

Report summary

The smelter was commissioned in 1927 with two coal fired, calcine charged reverberatory furnaces.  In 1957 a wet charged, coal fired reverberatory furnace was added to treat custom concentrates.  By 1970 economics dictated a change from coal to oil firing and in 1984 natural gas was made available as an alternative to oil.  The Noranda reactor was installed in 1973 and operated with two reverberatory furnaces. Experiments with oxygen enrichment led to the installation of the large oxygen...

Table of contents

  • Key facts
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

  • Key facts: Table 1
  • Detailed map
  • Participation: Table 1
  • Flowsheet
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Production
  • Products: Table 1
  • Products allocation
  • Costs: Image 1
  • Costs: Table 1
  • Economic assumptions: Table 1

What's included

This report contains:

  • Document

    Horne copper smelter.xls

    XLS 410.50 KB

  • Document

    Horne copper smelter

    PDF 1.02 MB

Other reports you may be interested in

Browse reports by Industry Sector