Asset report

Horne copper smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The smelter was commissioned in 1927 with two coal fired calcine charged reverberatory furnaces. In 1957 a wet charged coal fired reverberatory furnace was added to treat custom concentrates. By 1970 economics dictated a change from coal to oil firing and in 1984 natural gas was made available as an alternative to oil. The Noranda reactor was installed in 1973 and operated with two reverberatory furnaces. Experiments with oxygen enrichment led to the installation of the large oxygen...

What's included

This report contains

  • Document

    Horne copper smelter.xls

    XLS 476.50 KB

  • Document

    Horne copper smelter

    PDF 592.26 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Images

  • Detailed map
  • Flowsheet
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Products: Table 1
  • Products allocation
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898