Asset Report

Huangmu zinc smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

18 February 2016

Huangmu zinc smelter

Report summary

The Lanping ore deposit was discovered in the 1970s and was initially exploited by a number of small mines and smelters, one of the latter was Huangmu. By 2003, the Huangmu smelter had fallen within the ownership of Yunnan Jinding where it was called the No1 smelter, Lanping is No2. At the end of 2011, it was decided to close the Huangmu smelter in 2012 and concentrate all operations at the larger Lanping smelter.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
    • Other
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1
  • Flowsheet

What's included

This report contains:

  • Document

    Huangmu (Electrolytic) closed zinc smelter

    XLS 256.50 KB

  • Document

    Huangmu zinc smelter

    PDF 631.87 KB

Other reports you may be interested in

Browse reports by Industry Sector