Huludao (VR) (closed) zinc smelter
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Emissions
- Conc. Receipt / Storage
- Roaster
- Acid Plant
- Smelting Furnace
- Refining
- Casting Plant
- Residue Disposal
- Other
Tables and charts
This report includes the following images and tables:
-
Huludao (VR) Emission Intensity Quartile Ranking - total global production - tonnes Zn equivalentFlowsheet
What's included
This report contains:
Other reports you may be interested in
Baoji (VR) (closed) zinc smelter
A detailed analysis of the Baoji (VR) zinc smelter.
$2,250Kunming (closed) zinc smelter
A detailed analysis of the Kunming zinc smelter.
$2,250Chisel North (Closed) zinc mine
A detailed analysis of the Chisel North (Closed) zinc mine.
$2,250