Asset Report

IMI (closed) copper refinery

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The refinery is located in Walsall near Birmingham and has excellent road links. Anodes are supplied from a secondary copper smelter on the same site. Fire refining commenced on the site in the 1917 and electrolytic refining was introduced in 1950. The capacity was expanded to 62kt/a cathode in the late 1960s by the construction of a second tankhouse. In November 1991, IMI signed a contract with MIM to use Isa process technology. The intention was to permit the production of grade 'A'...

Table of contents

  • No table of contents specified

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    IMI (closed) copper refinery

    PDF 1.21 MB