Asset Report
Jabali zinc mine project
Report summary
The deposit is expected to be mined by open pit at a rate of 800kt/a with a stripping ratio of 2:1. Ore is to be crushed and calcined prior to milling and leaching using ammonia based solutions. Zinc bearing solutions are to be purified before zinc carbonate is chemically precipitated by steam injections. Pure zinc carbonate is to be calcined for the production of 70kt/a of high quality zinc oxide (> 79% Zn).
Table of contents
- Summary
- Key issues
- Mining
- Processing
- CAPEX
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
12 March 2020
Akie zinc mine project
Asset Report
Akie zinc mine project
A detailed analysis of the Akie zinc mine project.
$2,25010 December 2019
Prairie Creek zinc mine project
Asset Report
Prairie Creek zinc mine project
A detailed analysis of the Prairie Creek zinc mine project.
$2,25012 March 2020
Back Forty zinc mine project
Asset Report
Back Forty zinc mine project
A detailed analysis of the Back Forty zinc mine project.
$2,250