Asset Report
Jervois copper mine project
Report summary
Jervois project is located about 280km North East of Alice Springs in Northern Territory, Australia. Project site can be reached from Alice Springs. Pre-feasibility study report was completed and released in Q4 2020. The accompanying analysis is based on PFS report result. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Black Butte copper mine project
A detailed analysis of the Black Butte copper mine project.
$2,250
Asset Report
Carmacks SxEw copper mine project
A detailed analysis of the Carmacks SxEw copper mine project.
$2,250
Asset Report
Ravensthorpe Gold/Copper copper mine project
A detailed analysis of the Ravensthorpe Gold/Copper copper mine project.
$2,250