Asset Report
Jharsuguda aluminium smelter
Report summary
Jharsuguda is located in Odisha, India. The smelter was commissioned with the purpose of phased expansion. The smelter originally consisted of two prebake lines across two halls with captive power supply. Phase one comprised 500ktpa of capacity. Phase 2 brought this up to 1100ktpa, adding a further two lines. A further proposed expansion to >1.6Mt/a will make Jharsuguda one of the world's largest smelters.
Table of contents
- Summary
- Key issues
- Alumina Source
- Anode Source
-
Power
- Power Type
- Power Source
- Power Supplier
- Power Contract
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
16 November 2021
Valladolid aluminium smelter
Asset Report
Valladolid aluminium smelter
A detailed analysis of the Valladolid aluminium smelter.
$2,25016 November 2021
Magnitude 7 Metals aluminium smelter
Asset Report
Magnitude 7 Metals aluminium smelter
A detailed analysis of the New Madrid aluminium smelter.
$2,25016 November 2021
Mostar aluminium smelter
Asset Report
Mostar aluminium smelter
A detailed analysis of the Mostar aluminium smelter.
$2,250