Asset report

Jinfeng gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Jinfeng is an underground mine with open pit operation ceased in April 2015 due to depletion of open pit ore. Conventional mining method of truck and shovel was employed at the open pit and full mechanised cut and fill methods are utilised at the underground mine. The ore is refractory in nature. The process plant has a capacity of 1.5Mt/aand uses the BIOX process to oxidise sulphide minerals before passing to a standard carbon in leach (CIL) circuit. Average annual production for the life of mine is 125koz Au.

What's included

This report contains

  • Document

    Jinfeng gold mine

    XLS 130.50 KB

  • Document

    Jinfeng gold mine

    PDF 535.04 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Operations
  • Timeline
  • Fiscal and regulatory

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898