Jinfeng gold mine
Report summary
Jinfeng is an underground mine, with open pit operation ceased in April 2015 due to depletion of open pit ore. Full mechanised cut and fill methods are utilised at the underground mine. The ore is refractory in nature. The process plant has a capacity of 1.5Mt/a and uses the BIOX® process to oxidise sulphide minerals before passing to a standard carbon-in-leach (CIL) circuit. The mine was sold to China Gold Group in September 2016 for $300 million.