Asset Report

Jinlong copper smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The smelter is located at Tongling, Anhui Province. The smelting technology is Flash and its capacity is 1.3Mt/a conc treated (450kt/a anodes produced). Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Emissions

Tables and charts

This report includes 6 images and tables including:

  • Jinlong Emission Intensity Quartile ranking – tonnes of Cu equivalent
  • Detailed map
  • Feed preparation
  • Smelting process
  • Auxiliary plants

What's included

This report contains:

  • Document

    Jinlong copper smelter

    PDF 1.76 MB

  • Document

    Jinlong copper smelter

    ZIP 1.25 MB