Asset Report

Jinwan (Jiangxi) zinc smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Jiangxi Copper Company Limited (JCCL) began the construction of the 100kt/a capacity Jinwan zinc smelter in June 2009 at a cost of US$75M (RMB497M). On the same site JCCL, started construction of a 100kt/a lead plant using Kivcet technology in Q2 2009. The lead and zinc smelters commissioned in early 2012 and end 2011 respectively.

What's included

This report contains

  • Document

    Jinwan (Jiangxi) zinc smelter

    PDF 739.28 KB

  • Document

    Jinwan (Jiangxi) zinc smelter.xls

    XLS 490.00 KB

Table of contents

Tables and charts

This report includes 14 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

You may be interested in

Asset Report

Kunming zinc smelter

Asset Report

Mengzi zinc smelter

Asset Report

Kaili zinc smelter

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800