Asset report

Jinwan (Jiangxi) zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

Jiangxi Copper Company Limited (JCCL)began the construction of the 100kt/a capacity Jinwan zinc smelter in June 2009 at a cost of US$75M (RMB497M). On the same site JCCL, started construction of a 100kt/a lead plant using Kivcet technology in Q2 2009. The lead and zinc smelters commissioned in early 2012 and end 2011 respectively.

What's included

This report contains

  • Document

    Jinwan (Jiangxi) zinc smelter

    PDF 739.28 KB

  • Document

    Jinwan (Jiangxi) zinc smelter.xls

    XLS 490.00 KB

Table of contents

Tables and charts

This report includes 14 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898