Asset report

Jinwan (Jiangxi) zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Jiangxi Copper Company Limited (JCCL)began the construction of the 100kt/a capacity Jinwan zinc smelter in June 2009 at a cost of US$75M (RMB497M). On the same site JCCL started construction of a 100kt/a lead plant using Kivcet technology in Q2 2009. The lead and zinc smelters commissioned in early 2012 and end 2011 respectively.

What's included

This report contains

  • Document

    Jinwan (Jiangxi) zinc smelter

    PDF 739.28 KB

  • Document

    Jinwan (Jiangxi) zinc smelter.xls

    XLS 494.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Projects
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898