Asset report

Johnson Camp SxEw copper mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The accompanying analysis considers the resumption of copper cathode production at the historic Johnson Camp mining area. The targeted production rate was 25Mlb/a of copper cathode over a 16 year mine life. The restart project involved relining an existing solution pond construction of three new lined ponds preparation of a new stand alone lined leach pad facility for approximately 60 percent of the new ore that will be leached and installation of a three stage crushing circuit. The SX/EW...

What's included

This report contains

  • Document

    Johnson Camp SxEw copper mine

    XLS 488.00 KB

  • Document

    Johnson Camp SxEw copper mine

    PDF 430.43 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Costs
  • Operations
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898