Asset Report
Josemaria gold mine project
Report summary
The Josemaria project is located in Argentina in San Juan province, close to the Chilean border. The project considers a ~55ktpa operation to produce a copper concentrate with gold and silver by-product. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Processing
- Capex
- Operating
- Royalties and taxes
- Permitting
- Community relations
Tables and charts
This report includes 1 images and tables including:
What's included
This report contains:
Other reports you may be interested in
Asset Report
Springpole gold mine project
A detailed analysis of the Springpole gold mine project
$2,250
Asset Report
Yaoure gold mine project
A detailed analysis of the Yaoure gold mine project.
$2,250
Asset Report
Tocantinzinho gold mine project
A detailed analysis of the Tocantinzinho gold mine project.
$2,250