Asset Report

K&S iron ore mine

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

12 September 2018

K&S iron ore mine

Report summary

The Kimkan and Sutara mine, better known as K&S, is a small mine located in the Jewish Autonomous Region (EAO) of the Russian Far East. It is 100% owned by Hong Kong listed IRC. After numerous delays, K&S is ramping up production with 1.6 Mt produced in 2017. While the plant has operated for a brief period at full capacity and was said to be operating at 78% capacity at the end of June 2018, there remain bottlenecks in the production process including issues with the drying unit and the mining contractor, CNEEC. The plant is expected to be operating at full capacity toward the end of 2018 and we have assumed that they will produce 3.2 Mt from 2019 onward. K&S has been designed to have a second phase that would double its production capacity to 6.3 Mtpa but IRC has experienced technical and funding issues throughout Phase 1 and as such, we do not expect they will be able to secure the capital necessary to build Phase 2.

Table of contents

Tables and charts

This report includes 13 images and tables including:

  • Key facts: Table 1
  • Participation (%)
  • Marketable reserves (at 01/01/2018)
  • Production: Image 1
  • Operations
  • Cash cost
  • Product quality
  • Economic assumptions
  • Location maps: Image 1
  • Production: Image 2
  • Production: Table 1
  • Infrastructure: Table 1
  • Costs: Table 2

What's included

This report contains:

  • Document

    K&S iron ore mine

    PDF 8.06 MB

  • Document

    KandS.xls

    XLS 204.50 KB