Asset Report
Kendall (Closed) gold mine
Report summary
The property is subject to a 5% NSR royalty payable to Crown Resources. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
06 December 2022
Rainy River gold mine project
Asset Report
Rainy River gold mine project
A detailed analysis of the Rainy River gold mine project.
$2,25022 December 2015
Laverton (Closed) gold mine
Asset Report
Laverton (Closed) gold mine
A detailed analysis of the Laverton (Closed) gold mine.
$2,25022 December 2015
Warrego Tailings (Closed) gold mine
Asset Report
Warrego Tailings (Closed) gold mine
A detailed analysis of the Warrego Tailings (Closed) gold mine.
$2,250