Asset Report
Kerr-Sulphurets-Mitchell (KSM) copper mine project
Report summary
The KSM project is one of the worlds largest undeveloped copper-gold deposits, with 38Moz of gold and 10 billion pounds of copper in reserves. Based on the pre-feasibility study, the project has an approximate 51 year lifespan with average annual gold and copper production of 500koz and 147Mlb respectively. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
- Emissions
- CAPEX
- Mining
- Process
Tables and charts
This report includes 2 images and tables including:
- Kerr-Sulphurets-Mitchell Emission Intensity Quartile Ranking - total global production - tonnes Cu equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Kerr-Sulphurets-Mitchell (KSM) gold mine project
A detailed analysis of the Kerr-Sulphurets-Mitchell (KSM) gold mine project.
$2,250
Asset Report
Carmacks SxEw copper mine project
A detailed analysis of the Carmacks SxEw copper mine project.
$2,250
Asset Report
Udokan copper mine project
A detailed analysis of the Udokan copper mine.
$2,250