Kimitsu steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Iron ore
- Coal
- Coke
- Metallics
- Energy
- Capital costs
- Operating cash costs
Tables and charts
This report includes the following images and tables:
- Detailed map
- Final steel production (Mt)
- Production table (Mtpa)
- Operation cash costs table (US$/tonne)
- Economic assumptions
What's included
This report contains:
Other reports you may be interested in
SK308 (LNG)
Block SK308 comprises several shallow water fields located approximately 200 kilometres offshore Sarawak. F23 SW was the first field to ...
$3,720Senoro-Toili JOA (LNG)
The Senoro-Toili block, located in the Matindok area in Central Sulawesi, contains the Tiaka oil field and the Senoro gas field. The ...
$3,720Doropo mine
A detailed analysis of the Doropo mine
$2,250