Asset Report
Konimansuri Kalon zinc mine
Report summary
Konimansuri is principally a silver deposit. The reserve is estimated at one billion tonnes of ore grading 49g/t Ag, 0.38% Zn and 0.49% Pb. The Tajikistan government has repeatedly put up the development of the mine on tender since 2011 but as of mid 2023 nothing has been finalised as yet. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- CAPEX
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Hellyer Mine Restart (Closed) zinc mine
A detailed analysis of the Hellyer Mine Restart zinc mine.
$2,250
Asset Report
Andaychagua zinc mine
A detailed production, commercial and costs analysis of the Andaychagua zinc mine.
$2,250
Asset Report
Huanzala (Santa Luisa) zinc mine
A detailed production, commercial and cost competitive analysis of the Huanzala (Santa Luisa) zinc mine.
$2,250