Asset report

Konkola copper minesite

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The following notes and accompanying analysis cover on going operations at Konkola underground mine and concentrator together with the new Konkola Deep Mining Project (KDMP). The KDMP entails the sinking of a new shaft to a depth of around 1 500m together with associated ventilation and dewatering shafts. Construction and underground development commenced in 2006 with production ramping up from 2012.

What's included

This report contains

  • Document

    Konkola Minesite copper mine

    XLS 558.00 KB

  • Document

    Konkola copper minesite

    PDF 517.35 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Costs
  • Production
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

North Mara gold mine

Asset report

Buzwagi gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898