Asset Report

Kulumaziba copper minesite

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The following notes and accompanying analysis cover the historical production of a copper oxide concentrate from a Heavy Media Separation (HMS) plant at Kalumaziba operation. Production of HMS concentrate commenced in 2005 and ceased in 2008. The analysis also includes the Mutoshi SxEw project, which may potentially produce copper cathode and cobalt in hydroxide from 2023. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Kulumaziba copper minesite.xls

    XLS 383.00 KB

  • Document

    Kulumaziba copper minesite

    PDF 1.22 MB