Asset Report
Kulumaziba Mutoshi SxEw - Cobalt Mine
Report summary
This profile includes notes on the former Mutoshi mine, the Mutoshi Northwest deposit, the Nioka deposit, the Kamukonko cobalt prospect, some prospective ground on the southern edge of the Kolwezi Klippe, and the adjacent Kulumaziba operation. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
- Mining
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
21 March 2023
Metalkol SxEw - Cobalt Mine
Asset Report
Metalkol SxEw - Cobalt Mine
A detailed production, commercial and competitive analysis of the Metalkol RTR SxEw copper cobalt plant.
$2,25021 March 2023
Tenke Fungurume SxEw - Cobalt mine
Asset Report
Tenke Fungurume SxEw - Cobalt mine
A detailed analysis of the Tenke-Fungurume SxEw copper mine.
$2,25021 March 2023
Moa Bay - Cobalt mine
Asset Report
Moa Bay - Cobalt mine
A detailed analysis of the Moa Bay nickel operation.
$2,250