Asset Report
Metalkol SxEw - Cobalt Mine
Report summary
The Metalkol plant involves the re-treatment of oxide tailings produced by the mineral concentrator facility in Kolwezi, which processed high-grade ore from KOV and other nearby mines from 1952 onwards. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Tenke Fungurume SxEw - Cobalt mine
A detailed analysis of the Tenke-Fungurume SxEw copper mine.
$2,250
Asset Report
Goro - Cobalt mine
A detailed analysis of the Goro nickel cobalt operation.
$2,250
Asset Report
Moa Bay - Cobalt mine
A detailed analysis of the Moa Bay nickel operation.
$2,250