Asset Report

Lagunas Norte (Alto Chicama) gold mine

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The mine is a typical open pit heap leaching operation with gold recovered via a Merrill Crowe circuit. In 2015, a Pre-Feasibility Study was completed for a Mine Life Extension (MLE) Project. The MLE project is based on the mining of sulphide mineralisation beneath the existing oxide orebody, and processing of refractory ore (currently being stockpiled) with potential to extend mine life by 9 years commencing in 2021. Open pit mining and Heap Leach operations are expected to cease in 2023 as production from stockpiled refractory ore commences.

What's included

This report contains

  • Document

    Lagunas Norte (Alto Chicama) gold mine

    XLS 132.50 KB

  • Document

    Lagunas Norte (Alto Chicama) gold mine

    PDF 497.68 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Detailed map

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800