Asset Report
Leninogorsk (Ridder) zinc smelter
Report summary
The Leninogorsk zinc smelter in Kazakhstan uses roast, leach, electrowin technology to produce slab zinc. Leach residue is treated by Waelz kiln, and since 2006 oxide ore from the Shaimerden ore body has also been processed through these. the current capacity of the smelter is 120kt/a slab zinc and there are no plans to increase this. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Emissions
Tables and charts
This report includes 8 images and tables including:
- Ridder (Leninogorsk) Emission Intensity Quartile Ranking - total global production - tonnes Zn equivalent
- Detailed map
- Flowsheet
- Feed Preparation
- Roaster and Acid Plant
- Leaching and Purification
- Tankhouse, Melting and Casting
What's included
This report contains:
Other reports you may be interested in
Asset Report
Ridder (Leninogorsk) zinc mine
A detailed analysis of the Ridder (Leninogorsk) zinc mine.
$2,250
Asset Report
Ridder (Leninogorsk) gold mine
A detailed analysis of the Ridder (Leninogorsk) gold mine.
$2,250
Asset Report
Ust-Kamenogorsk zinc smelter
A detailed analysis of the Ust-Kamenogorsk zinc smelter.
$2,250