Asset Report

Limon gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The property comprises the 12,000ha Mina El Limon mineral concession, including the underground mines (Santa Pancha 1, Santa Pancha 2, Veta Nueva and Panteon) and Limon Central open pit. The plant has a capacity of 500kt/a and comprises a carbon-in-pulp (CIP) circuit. In 2020, gold production was 65koz. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • Mining
  • Processing

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Limon gold mine

    XLS 144.00 KB

  • Document

    Limon gold mine

    PDF 901.95 KB

  • Document

    Limon gold mine

    ZIP 730.06 KB