Asset Report
Lisbon Valley SxEw copper mine
Report summary
After re-commencing commercial production in 2006, mining and crushing activities ceased in January 2008. The accompanying analysis assumes residual leaching continued until 2010. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
-
Key issues
- Mining
- Process
- Leach
- SxEw
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Milpillas SxEw copper mine
A detailed production and cost competitive analysis of the Milpillas SxEw copper mine.
$2,250
Asset Report
Monywa SxEw copper mine
A detailed analysis of the Monywa SxEw copper mine.
$2,250
Asset Report
Johnson Camp SxEw copper mine
A detailed analysis of the Johnson Camp SxEw copper mine.
$2,250