Asset report

Lisheen zinc mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Lisheen is comprised by underground mining and a 6kt/d ore concentrator. The primary mining methods adopted at Lisheen were room and pillar and drift and fill with blast hole stoping used in thicker areas of the deposit. The concentrator used sequential flotation and operated 365 days a year at a capacity of around 5 000tpd. After 17 years of operation mining at Lisheen stopped in November 2015 and the planned closure of the mill occurred in December 2015.

What's included

This report contains

  • Document

    Lisheen zinc mine

    XLS 526.50 KB

  • Document

    Lisheen (Closed) zinc mine

    PDF 757.15 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898