Asset Report
Los Pelambres copper mine
Report summary
The Los Pelambres operation comprises an open-pit mine and crushing plant located at 3050masl connected to a beneficiation plant at 1600masl. by a 12.7km long conveyor. Copper concentrate produced at the beneficiation plant is transported by a 120km pipeline to a filter plant at Punta Chungo, to the north of the port of Los Villos. Tailings from the beneficiation plant are pumped 60km to the Mauro tailings dam.
Table of contents
- Summary
- Key Issues
-
Emissions
- Power
- CAPEX
- Mining
-
Processing
- Conveying
- Plant
Tables and charts
This report includes 2 images and tables including:
- Los Pelambres Emission Intensity Quartile Ranking - total global production - tonnes Cu equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Los Azules copper mine project
A detailed analysis of the Los Azules copper mine project.
$2,250
Asset Report
Los Calatos copper mine project
A detailed analysis along the production and commercialisation chain of the Los Calatos copper mine project.
$2,250
Asset Report
Los Chancas copper mine project
A detailed analysis along the production and commercialisation chain of the Los Chancas copper mine project.
$2,250