Asset Report

Lundberg & Engine House zinc mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The project is being developed by Buchans Resources. A preliminary economic assessment study was completed in 2011 and work was on-going to advance the project to pre-feasibility study level. The preferred option is to exploit the deposits by open pit method. Due to the early stage of project development, 2026 is the earliest possible start up date for zinc production. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • Mining
  • Processing
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Lundberg & Engine House zinc mine

    XLS 376.00 KB

  • Document

    Lundberg & Engine House zinc mine

    PDF 1.21 MB

  • Document

    Lundberg & Engine House zinc mine

    ZIP 1.07 MB