Lundberg & Engine House zinc mine
Loading current market price
Report summary
The project is being developed by Buchans Resources. A preliminary economic assessment study was completed in 2011 and work was on-going to advance the project to pre-feasibility study level. The preferred option is to exploit the deposits by open pit method. Due to the early stage of project development, 2023 is the earliest possible start up date for zinc production.
What's included
This report contains
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key Issues
- Location maps
- Geology
-
Operations
- Mining
- Processing
-
Costs
- CAPEX
- Timeline
Tables and charts
This report includes 2 images and tables including:
Images
- Detailed map
Tables
- Key facts: Table 1
You may be interested in
Alouette aluminium smelter
Las Truchas iron ore mine
El Volcan iron ore mine
Questions about this report?
-
Europe:+44 131 243 4699
-
Americas:+1 713 470 1900
-
Asia Pacific:+61 2 8224 8898