Asset report

Magnitude 7 Metals aluminium smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Noranda's New Madrid smelter in Missouri was built in 1971. It remains the company's sole primary aluminium smelter with a target capacity of 280ktpa. The smelter forms part of a fully integrate bauxite semis value chain.

What's included

This report contains

  • Document

    New Madrid aluminium smelter

    XLS 96.00 KB

  • Document

    Magnitude 7 Metals aluminium smelter

    PDF 1.00 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Raw materials
  • Process overview
  • Products
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898