Asset Report

Mantoverde Sulphide copper mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

This analysis considers the development of a mill operation to process sulphide ore from the Mantoverde deposit. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
    • Emissions
    • Water
    • Mining camp
    • Royalties and taxes
    • Community relations
    • Environmental reclamation

Tables and charts

This report includes 2 images and tables including:

  • MantoVerde Sulphide Emission Intensity Quartile Ranking - total global production - tonnes Cu equivalent

What's included

This report contains:

  • Document

    Mantoverde Sulphide copper mine project

    PDF 1.35 MB