Asset Report

Marimaca copper mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Marimaca copper project is located 45km north of Antofagasta, Chile. Fully owned by Marimaca Copper Corp, a preliminary economic assessment (PEA) was released in September 2020. Conventional open pit mining method is proposed to extract ore feed to crush heap leach and ROM leach plant. Phase 1 plant will have capacity of 5.4Mt/a and Phase 2 expansion proposed will have capacity of 9Mt/a. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • Emissions
  • Mining
  • Processing

Tables and charts

This report includes 2 images and tables including:

  • Marimaca Emission Intensity Quartile Ranking - total global production - tonnes Cu equivalent
  • Detailed map

What's included

This report contains:

  • Document

    Marimaca copper mine project

    PDF 1.73 MB

  • Document

    Marimaca copper mine project.xls

    XLS 362.00 KB