Asset Report
McArthur River zinc mine
Report summary
McArthur River is an open pit zinc-lead-silver mine, exploiting a large sedimentary stratiform orebody located in the Northern Territory. The mine was converted to an open pit in 2009, mining ore at a rate of 2.5Mtpa. In 2013, Glencore Xstrata announced that it would proceed with the US$360M expansion of the open pit, which would enable mining throughput of 5.5Mtpa by the end of 2014 and correspond with an increase in concentrate production from 360ktpa to 800ktpa. In October 2015 Glencore announced that it would reduce mined zinc production by 500,000tpy across its operations in Australia, South America and Kazakhstan. Glencore explained that the reductions were necessary to preserve the value of the company's reserves in the ground at a time of low lead and zinc commodity prices. At McArthur River output would be cut by 135,000tpy of zinc-in-concentrate. In addition up to 70 jobs would be made redundant at the site.
Table of contents
- Emissions
- Mining
- Open Pit
- Underground
- Process
- CAPEX
Tables and charts
This report includes 4 images and tables including:
- McArthur River Emission Intensity Quartile ranking – total global production - tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
McArthur River zinc smelter project
A detailed analysis of the McArthur River zinc smelter project.
$2,250
Asset Report
Dugald River zinc mine
A detailed analysis of the Dugald River zinc mine.
$2,250
Asset Report
Hackett River zinc mine project
A detailed analysis of the Hackett River zinc mine project.
$2,250