Asset Report

Mengzi zinc mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Mengzi has been expanded a number of times to compensate for falling grades since starting production in 1997. These expansions have resulted in increased power requirements, but poor supply has adversely impacted production in the past. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • Mining
  • Process

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Mengzi zinc mine

    XLS 434.00 KB

  • Document

    Mengzi zinc mine

    PDF 1.25 MB

  • Document

    Mengzi zinc mine

    ZIP 1.07 MB