Asset Report
Mesquite gold mine
Report summary
Mesquite is a conventional truck and shovel open pit operation. Ore is processed by heap leaching methods in a carbon-in-column (CIC) circuit. Gold production in 2020 was 141 thousand ounces. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Ergo Tailing Treatment Plant (Daggafontein, Crown & ERPM) gold mine
A detailed analysis of the Ergo Tailing Treatment Plant (Daggafontein, Crown & ERPM) gold mine.
$2,250
Asset Report
Yatela gold mine
A detailed analysis of the Yatela gold mine.
$2,250
Asset Report
Horne 5 gold mine project
A detailed analysis of the Horne 5 gold mine project
$2,250