Asset report

Metates gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The project includes two different sites connected by a road and a 127km pipeline. The Metates mine site includes an open pit, crushing and milling facilities and flotation and thickener plant. The El Paso site includes a limestone quarry, autoclave facility, leaching facility, Merrill-Crowe plant, acid neutralisation tank, SX/EW plant. The estimated mine life is 17 years excluding pre-stripping but the plan is to operate for an additional 10 years by treating stockpile ores.The Metates Plant will produce a sulphide bulk concentrate, then transported to El Paso Plant to produce zinc ingot, silver and gold dore.

What's included

This report contains

  • Document

    Metates gold mine project

    XLS 133.00 KB

  • Document

    Metates gold mine project

    PDF 816.73 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898