Asset report

Metates gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The project includes two different sites connected by a road and a 127km pipeline. The Metates mine site includes an open pit crushing and milling facilities and flotation and thickener plant. The El Paso site includes a limestone quarry autoclave facility leaching facility Merrill Crowe plant acid neutralisation tank SX/EW plant. The estimated mine life is 17 years excluding pre stripping but the plan is to operate for an additional 10 years by treating stockpile ores.The Metates Plant will produce a sulphide bulk concentrate then transported to El Paso Plant to produce zinc ingot silver and gold dore.

What's included

This report contains

  • Document

    Metates gold mine project

    XLS 133.00 KB

  • Document

    Metates gold mine project

    PDF 816.64 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Costs
  • Operations
  • Infrastructure
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898