Asset report

Metates zinc mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The project includes two different sites connected by a road and a 127km pipeline. The Metates mine site includes an ore open pit, crushing and milling facilities and flotation and thickener plant. The El Paso site includes a limestone quarry, autoclave facility, leaching facility, Merrill-Crowe plant, acid neutralisation tank, SX/EW plant. The estimated mine life is 17 years excluding pre-stripping but the plan is to operate for an additional 10 years by treating stockpile ores. The plant will produce zinc ingot, silver and gold dore.

What's included

This report contains

  • Document

    Metates zinc mine project

    XLS 514.00 KB

  • Document

    Metates zinc mine project

    PDF 665.36 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898