Middletown steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Iron ore
- Coal
- Coke
- Metallics
- Energy
- Capital costs
- Operating cash costs
Tables and charts
This report includes the following images and tables:
-
Detailed mapParticipationSteel plant overview
-
Key raw materials ratesDownstream productsFinished steel productionProduction table (Mt)Capital costsTotal operating cash costs - Finished steelOperating cash cost tableEconomic assumptions
What's included
This report contains:
Other reports you may be interested in
Port Talbot (BOF) steel plant
Tata Steel will halt its blast furnace operations by September 2024 as part of its strategic shift towards low-carbon EAF steel production.
$2,250Global steel cost summary
Global average steelmaking costs are expected to soften by 1.0% in 2026, driven by falling raw material and energy prices.
$6,750Scunthorpe (BOF) steel plant
British Steel has announced it will close down its blast furnaces in Scunthorpe by 2026, in a move to switch to EAF-based steelmaking.
$2,250