Asset report

Mount Isa copper smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Mount Isa copper smelter was commissioned in 1953 to treat the concentrate from the Mount Isa mine. A new smelter with a capacity of 100kt/a blister was commissioned on the same site in 1962. In 1973 a fluid bed roaster replaced the multiple hearth roasters, increasing capacity to 150kt/a blister. In 1979, anode casting facilities were added to produce anodes for refining at Townsville and a rise in concentrate grade increased smelter capacity to 165kt/a anode by 1985. In October 1990...

What's included

This report contains

  • Document

    Mount Isa copper smelter

    PDF 500.73 KB

  • Document

    Mount Isa copper smelter.xls

    XLS 480.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Environmental
    • Products allocation
  • Costs
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Images

  • Detailed map
  • Flowsheet
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Products: Table 1
  • Costs: Table 1
  • Economic assumptions: Table 1
  • Products: Table 2

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898