Mumbwa copper mine project


Mumbwa copper mine project

Report summary

The latest pre-feasibility study was published in September 2013. Underground mining at a rate of 3Mt/a was considered over a mine life  of 11 years. The main reason underlying the choice of underground mining was to lower the capex of the project.

The processing route proposed was conventional flotation to produce copper concentrate, which would be subsequently leached and converted to copper cathode through Solvent Extraction Electro-Winning (SXEW).

What's included?

This report includes 2 file(s)

  • Mumbwa copper mine project PDF - 252.55 KB 4 Pages, 1 Tables, 0 Figures
  • Mumbwa copper mine project XLS - 499.00 KB

Description

This Copper Metals Mine report provides a detailed analysis of the cost profile, geology, reserves and future production for this mine, as well as a detailed location map.

Copper producers, advisors and financial companies can use this report to better understand asset value and efficiency of the operation. It will also help you benchmark against similar mines, identify acquisition opportunities and examine evolving cost structures to strengthen business strategies.

Wood Mackenzie's cost methodology is the established global industry standard, relied on by the world’s leading investment banks and mining companies to make strategic, operational and investment decisions.

Our analysts are based in the markets they analyse, working with high-quality proprietary cost databases and cost curve analyses to write consistent and reliable insights. Our database includes over 2,450 asset analyses covering more than 1,000 companies worldwide.

  • Key facts
  • Summary and key issues
    • Summary
    • Key issues
  • Participation
  • Geology
  • Reserves and resources
  • Infrastructure
    • Power
  • Costs
    • Capex
    • Operating
      • Labour
  • Production
  • Operations
    • Mining
    • Processing
  • Timeline

In this report there is 1 table or chart, including:

  • Key facts
    • Key facts: Table 1
  • Summary and key issues
  • Participation
  • Geology
  • Reserves and resources
  • Infrastructure
  • Costs
  • Production
  • Operations
  • Timeline
Requester's name : .............
Department : .............
Authoriser's Name : .............
Authoriser's signature : .............
Date : .............
Cost Centre : .............

Questions about this report?

Frequently Asked Questions

Mailenquiries@woodmac.com
  • Europe: +44 131 243 4699
  • Americas: +1 713 470 1900
  • Asia Pacific: +61 2 8224 8898
contact us

Why Wood Mackenzie?

As the trusted source of commercial intelligence for the world's natural resources sector for more than 40 years, we empower clients to make better strategic decisions with objective analysis and advice. Find out more...