Asset Report

Mumbwa copper mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The latest pre-feasibility study was published in October 2015. Underground mining at a rate of 2 Mt/a was considered over a mine life of 13 years. The processing route proposed was conventional flotation to produce copper concentrate, which would be subsequently leached and converted to copper cathode through SxEw. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Power
  • Capex
    • Labour
  • Mining
  • Processing

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Mumbwa copper mine project

    XLS 361.50 KB

  • Document

    Mumbwa copper mine project

    PDF 1.21 MB