Asset Report

Mumbwa copper mine project

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The latest pre-feasibility study was published in September 2013. Underground mining at a rate of 3Mt/a was considered over a mine life  of 11 years. The main reason underlying the choice of underground mining was to lower the capex of the project. The processing route proposed was conventional flotation to produce copper concentrate, which would be subsequently leached and converted to copper cathode through Solvent Extraction Electro-Winning (SXEW).

What's included

This report contains

  • Document

    Mumbwa copper mine project

    XLS 499.00 KB

  • Document

    Mumbwa copper mine project

    PDF 254.47 KB

Table of contents

Tables and charts

This report includes 1 images and tables including:

Tables

  • Key facts: Table 1

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898