Asset Report

Namosi copper mine project

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

18 September 2019

Namosi copper mine project

Report summary

As at Q3 2012, Newcrest placed Namosi with the projects that could be potentially delivered within 5 years. Considering potential permitting delays and infrastructural challenges (power, deep-water port), as well as the fact that Newcrest has other projects in its 5-year pipeline, Wood Mackenzie conservatively assumes start-up in 2025. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • Power
  • CAPEX
  • Mining
  • Process

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Namosi copper mine project

    XLS 501.00 KB

  • Document

    Namosi copper mine project

    PDF 994.79 KB

Trusted by leading organisations