Asset Report

Newman iron ore mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Newman is BHP's largest Pilbara based mining and processing hub with several large capacity surface mines, including Mt Whaleback (Orebodies 29,30 and 35), Eastern Ridge (Orebodes 23, 24 and 25) and Orebody 18. They all make up the BHP Newman Joint Venture. Together, these deposits produce, on average, 78 Mtpa. Newman is BHP's oldest and highest cost Pilbara operation. Contributing to its cost position is the higher average strip ratio of 2.7:1 and the longer average haul distances to crushers owing to the depth of the Mt Whaleback pit. Costs are expected to be lower in 2024 due to higher throughput and cooling inflation. In the long term, costs will gradually increase as Mt Whaleback ages.

Table of contents

  • Summary
  • Key issues

Tables and charts

This report includes 13 images and tables including:

  • Newman Emission Intensity Quartile ranking – Total global production- Tonnes of ore
  • Location Map
  • Participation
  • Marketable reserves (at 01/01/2023)
  • Production
  • Production
  • Operations
  • Infrastructure
  • Cash costs
  • Cash Costs
  • Capital costs
  • Product quality
  • Economic assumptions

What's included

This report contains:

  • Document

    Newman.xls

    XLS 202.00 KB

  • Document

    Newman iron ore mine

    PDF 1.45 MB

  • Document

    Newman iron ore mine

    ZIP 1.09 MB