Ningbo steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Iron ore
- Coal
- Coke
- Metallics
- Energy
- Capital cost
- Operating cash costs
Tables and charts
This report includes the following images and tables:
- Detailed map
- Participation
- Steel plant overview
- Key raw material rates
- Downstream products
- Finished steel production
- Production table (Mt)
- Capital cost
- Total operating cash costs: finished steel
- Operating cash cost table
What's included
This report contains:
Other reports you may be interested in
El Aouj iron ore mine
A feasibility study for Stage 1 of the 11 Mtpa El Aouj deposit was completed at the end of 2015; the mine will start operating in Q1 2027.
$2,250Mount Holly aluminium smelter
A detailed analysis of the Mount Holly aluminium smelter.
$2,250Beyond costs: How operational flexibility would reshape the 2026 Brazil’s reserve capacity auction
An insight that analyses the upcoming reserve capacity auction in Brazil
$3,000