Asset report

North Bullfrog gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The North Bullfrog project is planned as an open pit operation utilising conventional drill, blast and haul mining methods. Higher grade material will be processed by a 3kt/d mill, comprising a carbon-in-leach (CIL) circuit with life of mine (LOM) gold and silver recoveries of 87% and 74% respectively. Lower grade material will be processed by heap leaching with LOM gold and silver recoveries of 74% and 6% respectively. Ore will be processed through the mill for 6 years until 2027. Heap leaching is expected to continue until 2031, followed by an additional three years of residual leaching.

What's included

This report contains

  • Document

    North Bullfrog gold mine project

    PDF 589.07 KB

  • Document

    North Bullfrog gold mine project

    XLS 128.00 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898